Departmental Student Achievements of Civil Engineering (B. Tech):
Ms. Payal S Gurav
Topper Second Year 2025-2026
Ms. Payal S Gurav (Second Year Topper) from Department of Civil Engineering has been felicitated by Builder’s Association of India Satara Chapter on the occasion of Engineer’s Day on 15th Sept 2026.
Mr. Sagar R Pawar
Topper Third Year 2025-2026 (Design of Steel Structure)
Mr. Sagar R Pawar (Third Year Topper - Design of Steel Structure) from Department of Civil Engineering has been felicitated by Builder’s Association of India Satara Chapter on the occasion of Engineer’s Day on 15th Sept 2026.
Mr. Atharv S Shelar
Topper Third Year 2025-2026
Mr. Atharv S Shelar (Third Year Topper) from Department of Civil Engineering has been felicitated by Builder’s Association of India Satara Chapter on the occasion of Engineer’s Day on 15th Sept 2026.
Ms. Sakshi V Pawar
Topper Final Year 2025-2026
Ms. Sakshi V Pawar (Final year Topper) from Department of Civil Engineering has been felicitated by Builder’s Association of India Satara Chapter on the occasion of Engineer’s Day on 15th Sept 2026.
Hrishikesh S Babar, Shahid N Mulla, Atharva A Chavan
Investigate the Effects of a Commercial Complex's Risk using Earned Value Management and the Risk Priority Number Method
Hrishikesh S Babar, Shahid N Mulla, Atharva A Chavan, has successfully presented research paper titled “Investigate the Effects of a Commercial Complex's Risk using Earned Value Management and the Risk Priority Number Method” in International Conference on Global Advances in Science, Engineering, Technology & Management on 16th May 2026.
Yash P Waskar, Uday D Wagh, Tushar D Gaikwad
Automated Wireless Crack Detection System For Structural Health Monitoring Using Artificial Intelligence and Raspberry Pi
Yash P Waskar, Uday D Wagh, Tushar D Gaikwad has successfully published research paper titled “Automated Wireless Crack Detection System For Structural Health Monitoring Using Artificial Intelligence and Raspberry Pi” in Iconic Research and Engineering Journal Volume 09 Issue 11, May 2026
Aditya Jitendra Jangam, Sakshi Vikas Pawar, Laxmi Nanu Chavan
Geoinformatics Driven Smart Urban Road Network Planning with Renewable Energy Road Elements And Accident Hotspot Analysis
Aditya Jitendra Jangam, Sakshi Vikas Pawar, Laxmi Nanu Chavan has successfully published research paper titled “Geoinformatics Driven Smart Urban Road Network Planning with Renewable Energy Road Elements And Accident Hotspot Analysis” in International Journal of Innovative Research in Technology Volume 13 Issue 1, June 2026.
Yash Prashant Waskar
Simulation of Geotechnical Analysis Virtual Iternship
Mr. Yash Prashant Waskar, student of final year, Department of Civil Engineering, has successfully completed 10 weeks (July to September 2025) Virtual Internship on Simulation of Geotechnical Analysis Virtual Iternship organised by Eduskills and MIDAS.
Ms. Shweta Bansode
Topper First Year 2024-2025
Ms. Shweta Bansode (First year Topper) from Department of Civil Engineering has been felicitated by Builder’s Association of India on the occasion of Engineer’s Day on 15th Sept 2025.
Mr. Atharv Shelar
Topper Second Year 2024-2025
Mr. Atharv Shelar (Second Year Topper) from eDepartment of Civil Engineering has been felicitated by Builder’s Association of India on the occasion of Engineer’s Day on 15th Sept 2025.
Mr. Shahid Mulla
Topper Third Year 2024-2025
Mr. Shahid Mulla (Third year Topper) from Department of Civil Engineering has been felicitated by Builder’s Association of India on the occasion of Engineer’s Day on 15th Sept 2025.
Ms. Shweta B Kadam
Topper Final Year 2024-2025
Ms. Shweta Kadam (Final year Topper) from Department of Civil Engineering has been felicitated by Builder’s Association of India on the occasion of Engineer’s Day on 15th Sept 2025.
Mr. Utkarsh Kathale
QCad software
Mr. Utkarsh Kathale, final year student in Civil Engineering has attended and successfully completed training of QCad software organized by Spoken tutorial IIT Bombay & EduPyramids on 14 July 2025.
Ms. Madhura Vanjari
QCad software
Ms. Madhura Vanjari, final year student in Civil Engineering has attended and successfully completed training of QCad software organized by Spoken tutorial IIT Bombay & EduPyramids on 14 July 2025.
Mr. Shahid Mulla
QGIS software
Mr. Shahid Mulla, final year student in Civil Engineering has attended and successfully completed training of QGIS software organized by Spoken tutorial IIT Bombay & EduPyramids on 14 July 2025.
Ms. sakshi Pawar
QGIS software
Ms. Sakshi Pawar, final year student in Civil Engineering has attended and successfully completed training of QGIS software organized by Spoken tutorial IIT Bombay & EduPyramids on 14 July 2025.
Miss. Sahyadri Vikas Ghadge, Miss. Shweta Bhagawat Kadam, Mr. Yogesh Balkrishna Jadhav, Mr. Shriraj Rajendra Patil, Mr. Sarthak Gajanan Chaware and Prof. Ajinkya S. Shah
SUITABILITY OF NOISE ABSORBING PANELS BY USING PEANUT SHELL AND COCONUT SHELL
Miss. Sahyadri Vikas Ghadge, Miss. Shweta Bhagawat Kadam, Mr. Yogesh Balkrishna Jadhav, Mr. Shriraj Rajendra Patil, Mr. Sarthak Gajanan Chaware and Prof. Ajinkya S. Shah Students and faculty of Civil Department at Yashoda Technical Campus, has published reserach paper titled SUITABILITY OF NOISE ABSORBING PANELS BY USING PEANUT SHELL AND COCONUT SHELL in International Scientific Journal of Engineering and Management having ISSN 2583-6129.
Ms. Shweta B Kadam
Topper Third Year 2023-2024
Engineer's Day Celebration by Builder's Association of India, Satara Chapter on 14/09/2024
Ms. Rutuja N Phadtare
Topper Final Year 2023-2024
Engineer's Day Celebration by Builder's Association of India, Satara Chapter on 14/09/2024
Rutuja Phadatare
NPTEL Certificate
NPTEL Certificate - for Maintenance and Repair of Concrete Structures
Shivshankar Kamble
NPTEL Certificate
NPTEL Certificate - for Maintenance and Repair of Concrete Structures
Mr. Ketan Borate
NPTEL ELITE CERTIFICATE
NPTEL ELITE Certificate - for Maintenance and Repair of Concrete Structures
Mr. Avishkar Pradip Yadav
NPTEL certificate
NPTEL certificate for - Maintenance and Repair of Concrete Structures
1.Yspm S Yashoda Technical Campus Faculty Of Engineering 2. Miss. Namrata R.Mane 3.Mr. Omkar S.Patil 4.Mr. Nishant D. Savant 5.Miss.Vaishali V.Pawar 6.Prof.Alfaj N.Shaikh.
ROAD POT HOLE REPAIRING MACHINE
1.Yspm’S Yashoda Technical Campus, Faculty Of Engineering 2. Mr. Shaikh Sohel Musa 3.Mr. Tamboli Huzefa Faruk 4.Mr. Sawant Akshay Uday 5.Mr. Kamble Rohit Sonaji 6.Prof. Borate Prashant Gajanan
BRICK QUALITY EVALUATING MACHINE
Patent registered for "BRICK QUALITY EVALUATING MACHINE"
1. Yspm'S Yashoda Technical Campus, Faculty Of Engineering 2. Mr. Arjun Avinash Shivaji 3.Ms. Desai Sayali Shankar 4.Mr. Hakim Mohammadsabir Nasir 5.Mr. Khade Sagar Sanjay 6.Ms. Mane Neha Satish 7.Prof. Ajinkya S. Shah
FOOTSTEP-POWERED ENERGY GENERATION DEVICE
Patent registered for "FOOTSTEP-POWERED ENERGY GENERATION DEVICE"
1.Yspm's Yashoda Technical Campus, Faculty of Engineering 2. Mr. Girish S. Gaikwad 3.Mr. Sarang P. Patankar 4.Mr. Arjun M. Shinde 5.Mr. Rohan N. Saste 6. Mr. Siddhant A. Nikam 7.Mr. Nikhil S. Chavan 8. Prof.Alfaj N. Shaikh
"SEISMIC ZONE ANALYSING DEVICE"
Patent registered for "SEISMIC ZONE ANALYSING DEVICE"
Mr.Pawar Shrikant D. and Mr.Bagwan Saqeeb J.
Application of Expansive Material for Demolition of Concrete structure
The students of Yashoda Technical campus,Satara,Department of Civil engineering Students Mr.Pawar Shrikant D. and Mr.Bagwan Saqeeb J.have won the 3rd prize in a 4th national conference held by KBP college satara on Recent trends in engineering and technology the topic of "Application of Expansive Material for Demolition of Concrete structure". Project work done Under the guidance of Prof.Shaikh Alfaj N. (Assistant Professor).




























